Featured Projects

Hydrogen Refueling Kiosk
Type
PSA Pilot Hydrogen Refueling Kiosk
Client
Uni Associates, Air Liquide, PSA, NTU, Chiyoda
Duration
2023 till 2024
Responsibilities
Turnkey PE/LEW for Lightning Protection System, Electrical Distribution, Plant Process & Skid Laboratory Testing & Commissioning

Reduce, Reuse & Recycle
Type
Pilot Modular Sludge Treatment, High-tech Waste Management, Plastic Recovery
Client
Leader Environmental Technologies Limited, Modern Asia Environmental Holdings, TES
Duration
2023 till 2025
Responsibilities
Turnkey PE/LEW for Lightning Protection System, Building Services & Plant Process Testing & Commissioning

Tekong Polder
Type
Building of Dykes, Drainage Canals & Pumping Stations below sea level
Client
Smitech Engineering Pte Ltd
Duration
2023 till 2024
Responsibilities
PE for lightning Protection System & LEW for Electrical Installations

GENEO CAPITALAND
Type
Life Science & Innovation Campus
Client
Ngee Cheng Electric Co Pte Ltd
Duration
2022 till 2025 in phases
Responsibilities
PE for lightning protection system & LEW 22kV for electrical installation

Due Diligence Consultancy & PV Submission
Type
Electricity connection
Client
YHS, L&L Products, BEX Pte Ltd for PV & EV, Amspec Services, TPG Telecom, Smart Power Hydrogen Station, Azuri Engineers
Duration
2022 till 2023 Turnkey projects
Responsibilities
Professional Engineer, LEW 22kV, on site verification & technical support. Solar PV SPPG Submission as Design & Installation LEW

ARTIFICIAL INTELLIGENCE-BASED EXPERT SYSTEMS FOR PROFESSIONAL ENGINEERING SERVICES
Type
Research, papers & implementation
Client
Industries that are affected by electricity bills hike
Duration
From last quarter of 2021
Responsibilities
PE for consultancy & LEW for turnkey engineering solutions

Yeo’s & Oatly production facility
Type
High tech automation line from production to packaging
Client
Yeo Hiap Seng / Oatly / Mckinsey / Orange Global
Duration
9 months (completion 1st quarter 2021)
Responsibilities
Design/Installation LEW coordinating technical submission from various process vendors & Building LEW. Supervision on all process T&C.

PPVC Temp Workers Dormitory Lightning Protection Design & Supervision
Type
TOLQ 5000 workers dormitory
Client
Ngee Cheng Electric Co. Pte Ltd
Duration
2 months (2020)
Responsibilities
Design & Supervision PE adopting natural component down-conductor for LPS

Swim lane electricity connection to temp workers dormitory
Type
TOLQ 1000 workers temporary dormitory
Client
Azuri Engineers Pte Ltd
Duration
2 months (2020)
Responsibilities
Design LEW

Ligthning Protection Design & Supervision for Plant
Type
Waste/Water treatment plant
Client
Creator Tech Pte Ltd
Duration
6 months (2019)
Responsibilities
Design & Supervision PE for process plant lightning protection system

Artificial Intelligent for Self Monitoring of Building Electrical Installation
Type
REITS, Industrial & Plant
Client
Beyond Electric Research Group
Duration
18 months (2018-2019)
Responsibilities
Influencer, System Integrator & Professional Engineer

ECO New Treatment Plant
Type
Waste Water Treatment & Central Ops Room
Client
ECO Special Waste Management Pte Ltd
Duration
6 months (2018)
Project cost
S$700,000.00
Responsibilities
QP, Consultancy, Installation & Process plant load profiling

Demand Aggregation Scheme
Type
Industrial & Residential
Client
Contestable Retailer
Duration
Within 4 weeks (2018)
Project cost
Varies with site engineering works
Responsibilities
Project Management & Modification works

Critical Plant Power Recovery
Type
Waste Treatment Plant
Client
ECO Special Waste Management Pte Ltd
Duration
9 months (2017)
Project cost
S$1,500,000.00
Responsibilities
QP, Consultancy, D&B, Engineering, T&C & Temporary Power

screenhunter_05-dec-27-16-37

Seafood Restaurant
Type
Major A&A and Fitout works
Client
Red House Seafood
Duration
6 months (2016)
Project cost
above S$1,500,000
Responsibilities
Electrical QP

screenhunter_03-dec-27-15-28

Downgrade HT to LT Supply
Type
Decommission HT & LT Reticulation
Client
Cambridge Industrial Trust at 60 Tuas South St 1
Duration
6 months (2016 to 2017)
Project cost
S$613,000.00
Responsibilities
QP, LEW, Design & Build engineering works

screenhunter_02-dec-27-15-24

ECO-Mastermelt
Type
Precious Metal Recycling
Client
ECO Mastermelt Pte Ltd
Duration
6 months (2016)
Project cost
S$350,000.00 (Core & Shell) S$180,000.00 (Internal Engineering Works)
Responsibilities
QP, Design, build, engineering, testing & commissioning

VIC

Viking Facilities Management & Operations Pte Ltd
Type
Commercial & Industrial Building
Client
Viking Facilities Management & Operations Pte Ltd
Position held
D&B Electrical Contractor
Duration
10 months (2014)
Project cost
S$1,400,000.00
Responsibilities
Project Management and Installation

Wasco

Wasco Engineering Service Singapore Pte Ltd
Type
Commercial & Industrial building 5 Pandan Road
Client
Wasco Engineering Service Singapore Pte Ltd
Position held
D&B Electrical Contractor
Duration
10 months (2015)
Project cost
S$1,595,000.00
Responsibilities
Install LEW, Project Management and Installation

79TSS5

LEW, High Tension reticulation, LT recovery & reticulation
Type
Industrial REITS 79 Tuas South St 5
Client
Cambridge Industrial Trust
Position held
QP, Design & Build contractor
Project cost
S$525,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW, Installation

43TVC

High Tension reticulation & LEW re-energisation
Type
Industrial REITS 43 Tuas View Circuit
Client
Cambridge Industrial Trust
Duration
3 months (2014)
Project cost
S$25,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW, Installation

ScreenHunter_07 Jul. 21 16.25

Major industrial building electrical power & ELV upgrade & reticulation
Type
Industrial REITS CIT 87 Defu Lane
Client
Cambridge Industrial Trust
Duration
6 months (2014)
Project cost
S$300,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW, Installation

ECO BIC Incinerator
Type
Waste to Energy / Cogeneration
Client
ECO Special Waste Management Pte Ltd /
BIC Systems Asia Pacific Pte Ltd
Position held
Design (BIC) and Installation LEW
Duration
9 months
Project cost
S$1,398,000 ECO & S$265,096 BIC
Responsibilities
Installation from PowerGrid 22kV intake down to 1480kW 400W turbine generator

Bosch EV Charging Station
Type
Electric Vehicle Charging Station
Client
Robert Bosch (SEA) Pte Ltd
Position held
Electrical Professional Engineer
Responsibilities
Inspection and hardware upgrade works for phase one charging station

The Harvest at Woodlands
Type
Industrial
Client
Ngee Cheng Electric Co (Pte) Ltd
Position held
Project Management and Installation
Duration
18 months
Project cost
S$1,338,000.00
Responsibilities
Electrical installation works including busduct and ELV

Cambridge Industrial Trust 30 Toh Guan Road
Type
Industrial, major electrical reticulation
Client
Cambridge Industrial Trust at 30 Toh Guan Road
Position held
Design PE, Design LEW, Installation LEW and contractor
Duration
6 months
Project cost
S$873,858.00
Responsibilities
Design & build for building electrical Infrastructure upgrade from 1MVA to 3MVA including new substation while existing tenants still in operation.

Raffles Business Suites at Hitachi Tower & Equity Tower
Type
Private / Serviced Office D&B _ A&A
Client
Raffles Business Suites
Position held
Principal Consultant
Duration
2 Months
Project cost
S$1,000,000.00
Responsibilities
Feasible Study, Design, Consultancy and LEW

Singapore Power Building Level 4, 6, 8 & 10 Storey
Type
Corporate / Chairman / CEOs & Corporate Offices D&B _ A&A
Client
Singapore Power Ltd
Position held
Principal Consultant
Duration
10 months / In phases
Project cost
S$3,000,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW

Singapore Power Training Institute 1, 2 & 4 Storey
Type
Corporate / SP Services Installation Branch & RM section / D&B _ A&A
Client
Singapore Power Ltd
Position held
Principal Consultant
Duration
3 months / In phases
Project cost
S$900,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW

JTC iHub Level 2
Type
Public / SME incubation Serviced Office / D&B _ A&A
Client
JTC Corporation
Position held
Principal Consultant
Duration
10 months / In phases
Project cost
S$1,200,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW

Equity Plaza common area major A&A
Type
Corporate / Common area, lobby, foyer, toilet major retrofit / D&B _ A&A
Client
Keppel Land
Position held
Principal Consultant
Duration
9 months
Project cost
S$880,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW

PUB Sludge Treatment Plant
Type
Waste / Sludge treatment / Plant Infrastructural / DBO _ Construction
Client
PUB
Position held
Project Management
Duration
10 months
Project cost
S$700,000.00
Responsibilities
Feasible Study, LEW, Installation

ECO Special Waste Management
Type
DBO _ Turnkey EIC
Client
Eco Swm Pte Ltd / Ebara Corp (Japan) / Yamato Sanko (Japan)
Position held
Design & Build Contractor
Duration
3 months
Project cost
S$600,000.00
Responsibilities
Feasible Study, LEW, Installation

Resort World Sentosa, Universal Studio Singapore
Type
Electrical distribution, control & instrumentation
Client
Fairmile Pty As Pro-Recreation (Australia)
Position held
Qualified Person / Contractor
Duration
9 months
Project cost
S$500,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW, Installation

Resort World Sentosa, Universal Studio Singapore
Type
Local Qualified Person
Client
Vekoma (Holland)
Position held
Qualified Person, Design & Install LEW
Duration
12 months
Responsibilities
Vekoma Rides: Battlestar Galactica, Enchanted Airways

PUB ABC waters
Type
Landscape / Water
Client
PUB / National Parks Board
Position held
Design & Install LEW
Duration
9 months

Singapore Botanical Garden
Type
Landscape
Client
Singapore Botanical Garden
Position held
Install LEW
Duration
15 months

Keyaki Japanese Restaurant at Pan Pacific Hotel
Type
Hotel F&B
Client
Pan Pacific Hotel
Position held
Qualified Person
Duration
6 months
Responsibilities
Feasible Study, Design, Consultancy

Best Western Jayleen 1918 Singapore Hotel
Type
Hotel
Client
Best Western Jayleen 1918 Singapore Hotel
Position held
Qualified Person
Duration
10 months
Responsibilities
Feasible Study, Design, Consultancy, Design, Install LEW

Bayer CropScience Singapore Laboratory at 21 Pandan Loop
Type
Pharmaceutical
Client
Bayer CropScience
Duration
6 months
Responsibilities
Feasible Study, Design, Consultancy, Design, Install LEW

Singapore Jamco
Type
Public / Private
Client
SIA Engrg Group / Singapore Jamco Pte Ltd
Duration
12 months
Responsibilities
Design, Consultancy, Design & Install LEW

Singapore Power Meter Section
Type
Corporate / Design & Build A&A
Client
Singapore Power Meter Section
Position held
Design & Build contractor
Duration
6 months
Project cost
S$360,000.00
Responsibilities
Feasible Study, Design, Consultancy, LEW, Installation

Bishan Park ABC Water
Type
Landscape / Water
Client
PUB / NPARK
Position held
Installation LEW
Duration
18 months
Tuas Seawater Desalination Plant
Type
Sea Water Desalination
Client
Camp Dressor Mckee (United States)
Position held
Front End Engineering design
Duration
1 month
Project cost
N.A.
Responsibilities